Demolition of 12 story building and leaving below grade garage intact. The scope of work for this job called for keeping the existing below grade parking garage intact – so we elected to demolish the building, one floor at a time, using Brokk remote controlled demolition machines. This job involved de-tensioning post-tension cables in transfer girders at second floor level – in a sequence determined by our structural engineer. Additionally, we performed asbestos abatement. This job was contracted with Clark Construction.
![Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-1.jpg)
![Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-2.jpg)
![Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-3.jpg)
![Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-4.jpg)
![Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-5.jpg)
![Thumbnail of Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-1-220x220.jpg)
![Thumbnail of Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-2-220x220.jpg)
![Thumbnail of Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-3-220x220.jpg)
![Thumbnail of Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-4-220x220.jpg)
![Thumbnail of Celtic Demolition - Crystal-Drive](https://celticdemo.com/wp-content/uploads/2020/11/Crystal-Drive-5-220x220.jpg)